Analysis of steel structure engineering installation points, quality, light recycling, no pollution

March 25, 2019

Steel structure engineering mainly means that the main load-bearing members are composed of steel. Including steel pillars, steel beams, steel structure foundations, steel roof trusses (of course, the span of the factory is relatively large, basically now is a steel structure roof truss), steel roof, steel wall can also be maintained with brick walls. Due to the increase in steel production in China, many of them have begun to adopt steel structure workshops. Specifically, they can also be divided into light and heavy steel structure workshops.

Industrial and civil construction facilities constructed of steel are called steel structures, and the construction of the steel structure has the following hot spots:

1. Steel structure construction is light in weight, high in strength and large in span;

2. The construction period of steel structure construction is short, which reduces the investment cost accordingly;

3. Steel structure construction has high fire resistance and strong corrosion resistance;

4. The steel structure building is easy to move and the recycling is non-polluting.

Yinxiang Steel Structure believes that steel structure engineering is prone to the following problems:

1. Overall collapse, solution: pay attention to the installation sequence and temporary support must be installed;

2, the quality of the weld is not closed, the solution: the weld that needs to be inspected must be welded by a skilled welder.

3. The pre-buried anchor of the column foot is not accurate and can not be installed. Method: Accurate measurement, fixed firmly when pouring concrete.

Steel structure engineering also needs to pay attention to the following problems during construction:

The position of the high-strength bolt should be reasonable. The construction space of the torque breaker and the torque wrench should be considered. Do not install it, because the space is too small, the twister and the torque wrench cannot be placed, etc., so that the high-strength bolt can not be twisted or high-strength. The bolt cannot be tightened. I have encountered some designs and even the position of the sleeve is not given.

If possible, use high-strength bolted joints. There used to be six of the top four of the middle joints. The workshop workers accidentally knocked a part of it back and couldn’t get it on the spot.

If the light steel structure has a maintenance brick wall, it must be docked with the construction unit and the civil construction unit in advance, because it involves two problems in the civil construction and the steel structure, because the brick wall of the civil construction is likely to be flat and colorful. The flooding of the steel plate can't be made big or small. The result is that the gap between the color steel plate and the brick wall is too big and small. It is difficult to make the flooding of the color steel plate and the brick wall, so that the construction unit has the heart to prepare.

Suzhou Yinxiang Steel Structure Engineering Co., Ltd. Main business items: color steel sandwich panel, profiled sheet, steel structure workshop, ceiling, color steel plate activity room, thin sheet, purification room, attic, roof plus layer, ALC light weight Gas concrete slabs, decoration and so on.

The company is backed by high-level development and research of new environmentally-friendly building materials. CAD-assisted design is used to create high-quality products, which are highly praised by customers.  

industrial hydraulic cylinder

Compact Cylinder,Custom Rod Eye Cylinder,Custom Eye Rod Cylinder

Wantong Hydraulic Co.Ltd. , http://www.sdhydro-cylinder.com